BCM MetroLink tram

Our Technology

100% Self-Powered

No overhead wire. No wayside power. Every BCM Ltd vehicle carries all the energy it needs for a full day of passenger service on-board.

The BCM Ltd Difference

Truly Wireless. Truly Self-Powered.

When other tram designers talk about "off-wire capabilities," they invariably mean the ability to bring down their pantographs for short runs — to cross bridges or run through areas where overhead wire is prohibited.

At BCM Ltd, our mission has always been to provide street running rail vehicles that are 100% self-powered. That means all of the energy required for up to a full 20-hour service day is carried on-board each vehicle, requiring no wayside power equipment of any kind.

Although we design for uninterrupted battery service, if the client demands it, we can provide energy sources such as overhead contact or opportunity charging as well as onboard generation through HFC or LNG ICE. Batteries are charged and balanced each night. The vehicle is simply plugged into a QCDC wall unit at its berth in the Depot, using the supplied high-voltage charging system.

20hrs
Daily service per charge
0
Wayside power required
100%
On-board energy storage
EN-50126
Safety standard certified

Traction Systems

Solo-Tractm Individual Wheelmotor Units

Hyper-efficient AI-controlled individual wheel speed using torque control

Eliminates scrub/slip/slide, reduces energy consumption, wheel wear, and noise

Solo-Trac wheelmotor unit — ST-1
Solo-Trac wheelmotor unit — ST-2
Solo-Trac wheelmotor unit — ST-3
Solo-Trac wheelmotor unit — ST-5

Propulsion Systems

Choose Your Power Source

LFP Battery + HFC, LTO Battery + Ultra caps, or LTO Battery + OCS

Zero Emission

Self-Powered Vehicles

All BCM Ltd trams and trolleys are available with battery-only propulsion systems. All energy for a full service day is stored on-board. Simply plug in overnight — no wayside infrastructure investment required.

  • Up to 20 hours daily passenger service
  • Overnight charging via QCDC wall panel
  • Proprietary BMS balances batteries every 7 sec., 24/7
  • Proven in years of public service
Carbon Neutral

Battery-Dominant Hydrogen/Electric

From Zero-emission battery-only to fully carbon-neutral hydrogen/electric propulsion utilizing locally harvested renewable energy. Future-proof, powerful, and resilient — available today and proven in years of public service.

  • World's first battery-dominant H2/electric tram
  • Fully carbon-neutral operation when coupled with renewable energy harvesting.
  • On-board generator refuelled once per day
  • From zero-emission to carbon-neutral — you choose

International Safety Standards

All trams and streetcars are designed, manufactured, and tested to comply with EN-50126, EN-50128, and EN-50129, as well as all other applicable railway safety standards.

Standard Gauge Track

BCM Ltd streetcars operate on standard gauge track. Because the track is not electrified, all aspects of its design, installation, and maintenance are simplified and significantly less costly.

Low-Impact Infrastructure

No overhead wire means non-electrified track. Our trackform is low-impact with rapid installation — dramatically reducing the cost and disruption of bringing rail back to your city.

Ready to Explore Our Solutions?

See how BCM Ltd's technology is applied across our range of trams and trolleys.